Book traversal links for Quick Deployment of Trimble DMS Solution
CHALLENGE
Need to quickly and efficiently deploy new Distribution Management System
Johnson City, Texas-based Pedernales Electric Cooperative (PEC), the largest electric cooperative in the US, wanted to quickly and efficiently deploy a new Distribution Management System (DMS) they could rely on.
SOLUTION
Professional services engagement, alignment and collaboration
PEC did an extensive evaluation of other DMS solutions and chose the Trimble DMS system both because it had familiarity with the Trimble and the proposed Trimble DMS solution had capabilities that the other solutions did not. After careful planning, coordination and execution between the Trimble Energy professional services team and the team from PEC, what was originally planned as a one year DMS implementation project was successfully completed in less than four months. The Trimble DMS solution deployed at PEC also include outage management capabilities to enable to fast-growing electric cooperative to improve outage response and compress service restoration times.
BENEFITS
Trimble Distribution Management System Implementation Reduced by Two Thirds
- Implementation took four months instead of twelve as originally planned
- Professionally managed DMS implementation
- PEC Trimble DMS system up and running on-time and on-budget
- Use of Trimble DMS system enables PEC to more proactively respond to outages and engage members
- Trimble DMS solution includes Trimble Outage Map for better PEC customer engagement during outages
- PEC saw overall improved customer communications online and on mobile devices through Trimble Outage Map